How we built the basement bathroom.



Picture of the sewer pipes which will be beneath the basement floor.


The basement floor has now been poured and finished. June 10, 2000. The white pipes can be seen comming up through the floor.


Picture of the main sewer line going from the castle to the septic system.


Picture of 2X4's on the floor where the walls of the bathroom will be.


The studs for the walls are in and the shower enclosure is now installed.


The plasterboard walls are now in as well as the toilet and sink. We have a working bathroom. There is still finish work (painting, etc.) to be done.