Some of the pictures of the work done in 1999.
What the building site looked like June 6, 1999.
Laying up block between the windows.
The basement part of tower # 2 almost finished, just two more rows to go. August 10, 1999.
Tower #2 and the basement walls almost finished.
View of the castle from the neighbors airplane September 12, 1999. If you look closely, you can see Moatmonster the backhoe in the lower part of the picture. He is guarding the building site. Tower #2 is on the left. The brown line down the middle is the 2,000 pound I-Beam.
Installing the floor joists with help from Mark.
This blockwork in the center of the basement will someday hold up the fireplaces on the 1st 2nd, and 3rd floors.